![]() Davis Bridge (graphic from Michgian Dragon Trail) |
from Michian's Dragon Trail
Those crossing Davis Bridge at the north end of Hardy Dam Pond, and the north end of the Dragon Trail in Newaygo County, Michigan, should be aware that the bridge is currently restricted to a single vehicle lane, with traffic alternating directions through the construction zone using temporary traffic signals on each side of the bridge.
Important notice for Pedestrians, Hikers, and Bicyclists:
MDOT is requesting that all non-motorized traffic use the closed portion of the bridge and remain inside the construction barrels while crossing. Both eastbound and westbound pedestrian and bicycle traffic should utilize the closed lane for their safety.
Please use caution when traveling through the area and follow all posted signs or directions given from construction personnel.
These traffic patterns will remain in place until bridge repairs are completed and the bridge is fully reopened.
See Dragon Trail Map
These links are checked on the date of the article. As the article ages, some links may become invalid
Go To www.getoffthecouchnews.blogspot.com for all the news
See Get Off The Couch


No comments:
Post a Comment