![]() Grand River Edges connection concept (graphic from Grand River Network) |
from Grand River Network
This project will close a major gap in the regional non-motorized Grand River Greenway trail system by linking Downtown Grand Rapids to Riverside Park and, by extension, the White Pine Trail State Park. It's length is about 0.75 mile.
This will be a new 12-ft wide multi-use trail on the east bank of the Grand River from Leonard St to Ann St, including safe at-grade street crossings, lighting, benches and signage.
Construction is set to begin spring 2026, and be completed by fall. The cost is $9.1 million, with funding coming from: City of Grand Rapids, Michigan Department of Natural Resources, Michigan Department of Transportation, American Rescue Plan Act (via Downtown Grand Rapids Inc. (DGRI) and Michigan Department of Natural Resources), and private partners
See trail site plan
These links are checked on the date of the article. As the article ages, some links may become invalid
Go To www.getoffthecouchnews.blogspot.com for all the news
See Get Off The Couch


No comments:
Post a Comment